中文 | English | Русский | طبعة اللغة
2007: Dripro was founded in Beijing.
2008:Started research and developing permanent installed Fiber Optical P/T monitoring system, and succeed installed into the well in 2009.
2009:Successfully designed multi-well control panel system and Fiber Optical DTS system.
2010:Successfully designed ball valve type completion fluids loss prevention valve
2011:Successfully designed flapper type completion fluids loss prevention valve
2012:Successfully designed 400 degree C completion fluids loss prevention valve
2013:Started upper and lower completion tools design and manufacturing.
2014: Successfully completed the research and development task of "horizontal well gravel packing sand control wellbore tool" entrusted by party A, and passed the acceptance inspection smoothly.
2015: Open hole gravel packing system was developed and accepted by party A.
2016: Developed single trip multi-zones sand control system tool.
2017: Single trip multi-zones sand control tool is successfully used on the sea.
Office: (86)-10-8479 8338 Fax: (86)-10-8479 8339 Address: Room B501,Building No. 2, No. 2 of North Taipingzhuang Road, Haidian District, Beijing, P.R.China. Postal Code: 100088
Harker Rapier Oilfield Service Limited Copyright © 2013 All Rights Reserved